Our Work

Saratoga public safety facility

Saratoga Public Safety Facility – Full Building Commissioning

Saratoga Springs, NY
Fusion Systems Engineering provided comprehensive commissioning services for a newly constructed 64,000-square-foot municipal and public safety facility. The scope included verification and optimization of all major energy-consuming systems, such as water-cooled VRF HVAC, condensing boilers, domestic hot water heaters, a cooling tower, VAV dedicated outside air systems, rooftop heat pumps, precision cooling for data center infrastructure, emergency ventilation controls, and a fully integrated energy management system. The commissioning process ensured that all systems met performance expectations from day one.
Learn More
701 river street (troy  ny)

701 River Street – Mixed-Use Facility with CCHP System

Troy, NY
Fusion Systems Engineering collaborated with Redburn Development to deliver an advanced MEP design for this innovative mixed-use building. The project centered around a custom Combined Cooling, Heating, and Power (CCHP) central plant, designed to operate in parallel with the utility grid and recover waste heat for domestic hot water and space heating during winter months. In the summer, the system powers an absorption chiller that distributes chilled water for cooling across both residential and commercial spaces. The entire setup is supported by net metering, delivering significant energy savings and exceptional return on investment.
Learn More
Skidmore college surrey williamson inn renovations (saratoga springs  ny)

Skidmore College – Surrey Williamson Inn HVAC Renovation

Saratoga Springs, NY
Fusion Systems Engineering provided HVAC design solutions for the renovation of Skidmore College’s Surrey Williamson Inn, which includes a 60-person meeting space, guest accommodations, and a banquet facility. The project addressed long-standing challenges related to the building’s low-pressure steam distribution and outdated boiler controls. A multi-zone inverter-driven split system was implemented to allow individualized climate control for the guest rooms and kitchen, while a new air handler was specified for the meeting space. Additionally, a custom ventilation algorithm was developed to balance kitchen makeup air with overall energy conservation and ventilation efficiency.
Learn More
Hampton summer residence (long island  ny)

Hampton Summer Residence – Seasonal Home MEP Design

Long Island, NY
Fusion Systems Engineering provided HVAC, plumbing, and electrical design services for a 3,500-square-foot seasonal residence in Long Island, NY. The project emphasized energy-efficient system design suited for intermittent use and coastal climate conditions. Our involvement spanned the design development and construction documentation phases, ensuring performance, reliability, and comfort in a high-end residential setting.
Learn More
Aesthetic science institute (latham  ny)

Aesthetic Science Institute – Trade School Mechanical Design

Latham, NY
Fusion Systems Engineering provided mechanical engineering design for a new 10,000-square-foot esthetician trade school. The facility’s program included specialized spaces such as nail and waxing clinics, a makeup classroom, faculty offices, conference rooms, student lounge, and faculty lounge. Our design focused on delivering efficient, comfortable HVAC systems tailored to the needs of both instructional and clinical environments.
Learn More
Diner time (latham  ny)

Diner Time – Restaurant Renovation & MEP Design

Latham, NY
Fusion Systems Engineering prepared MEP permit drawings for renovations to an existing standalone restaurant. The project included updates to the main dining areas and the addition of new front-of-house beverage and dessert stations. Our design focused on efficient system integration to support the refreshed layout while maintaining compliance with building codes and food service requirements.
Learn More
The knick apartments – 16 sheridan ave (albany  ny)

The Knick Apartments – Mixed-Use Residential with On-Site Cogeneration

Albany, NY
Fusion Systems Engineering provided full MEP design services for The Knick Apartments, a 92-unit mixed-use development featuring integrated on-site power generation. The building was engineered to recover waste heat from its generators for space heating and domestic hot water. During summer months, this recovered energy powers an absorption chiller to provide chilled water for ventilation air conditioning. The design also incorporates high-efficiency VRF systems to dynamically balance heating and cooling demands, optimizing the performance of the cogeneration system year-round.
Learn More
Mosu japanese steakhouse (colonie  ny)

Mosu Japanese Steakhouse – Specialty Restaurant MEP Design

Colonie, NY
Fusion Systems Engineering provided MEP design services for one of the most innovative restaurant concepts in the region. At Mosu Japanese Steakhouse, diners grill their own meals at custom gas-fired downdraft tables integrated directly into the dining room. The project required highly specialized design coordination for fire protection, grease exhaust, and HVAC systems — all modeled in 3D to ensure seamless integration. This unique venue pushed the boundaries of restaurant planning and engineering creativity.
Learn More
Hotel trilogy (colonie  ny)

Hotel Trilogy – Hospitality Expansion & MEP Renovation

Colonie, NY
Fusion Systems Engineering provided full MEP design services for a hospitality renovation and expansion project at Hotel Trilogy. The scope included a new 6,500-square-foot addition housing a bar, restaurant, and meeting space, as well as the complete renovation of the existing 2,500-square-foot hotel lobby. The upgraded systems were designed to enhance guest comfort, improve energy efficiency, and support the facility’s rebranding with modern amenities.
Learn More
The kenmore rain bo room (albany  ny)

The Kenmore Rain-Bo Room – Historic Venue Renovation

Albany, NY
Fusion Systems Engineering provided MEP and fire alarm system design for the renovation of the iconic Rain-Bo Room, an 8,000-square-foot historic event space once graced by jazz legend Duke Ellington. The project included substantial mechanical and electrical upgrades, along with the design of a new commercial kitchen to support its conversion into a modern catering venue. All improvements were carefully executed to preserve the original architectural finishes dating back to circa 1878, blending performance with preservation.
Learn More
Kenmoresteuben re development (albany  ny)

Kenmore/Steuben Redevelopment – Historic Mixed-Use Renovation

Albany, NY
Fusion Systems Engineering served as the Mechanical and Electrical engineer of record for a comprehensive design-build renovation of a historic 200,000-square-foot mixed-use building in downtown Albany. The project encompassed five floors of residential apartments, multiple commercial office spaces, three restaurants, two cocktail lounges, a catering hall, and an indoor farm. The HVAC design featured a water-source heat pump system with energy recovery, while the electrical scope included the design of a unique grid-paralleling distributed generation energy plant that captures and repurposes waste heat from four 65kW generators year-round.
Learn More
Chris’s coffee warehouse (latham  ny)

Chris’s Coffee Warehouse – Production Facility & Electrical Design

Latham, NY
Fusion Systems Engineering provided specialized electrical engineering services for the development of a new 55,000-square-foot production, distribution, and office facility for Chris’s Coffee. The scope included the relocation of existing roasting equipment and the integration of new European roasters and automated bagging systems. Electrical infrastructure was carefully designed to meet Class 2 Division 2 hazardous location requirements in accordance with the National Electrical Code (NEC), ensuring both safety and operational efficiency.
Learn More
Benjamin moore (johnstown  ny)

Benjamin Moore – Facility Expansion & Power Infrastructure

Johnstown, NY
Fusion Systems Engineering provided comprehensive MEP design services for a phased 125,000-square-foot expansion of an existing manufacturing facility. The project included new medium voltage site power distribution, a standby generator system, and full mechanical, electrical, and plumbing infrastructure. In addition to supporting the production areas, the scope also encompassed the design of a new office building, integrating both utility performance and workplace comfort into the overall solution.
Learn More
The wick

The Wick Hotel – Historic Warehouse Conversion

Hudson, NY
Fusion Systems Engineering provided complete MEP design for the transformation of a historic warehouse into a modern luxury hotel. The project involved the design and coordination of new electrical, plumbing, and HVAC systems, carefully integrated within a structure composed of multiple additions built over time. The renovation included a full commercial kitchen, dining facilities, and on-site power and heat cogeneration. This adaptive reuse project balanced modern performance with the preservation of architectural character.
Learn More
Excelsior apartments

Excelsior Building 6 – Residential Complex

Saratoga Springs, NY
Fusion Systems Engineering served as the engineer of record for all Mechanical, Electrical, Plumbing, and Fire Protection (MEP/F) systems in this five-story, 71,000-square-foot residential apartment complex. The building includes 47 units of varying sizes along with an enclosed parking garage. All systems were designed with a focus on cost-efficiency and long-term functionality, incorporating provisions for individual utility metering to support operational flexibility and tenant independence.
Learn More
Io nje eco

iO NJE ECO Commissioning (Edison, NJ)

Fusion Systems Engineering was contracted to commission the various building systems associated with a 1.5 MW Tier III data center build out in Edison, NJ. Services were comprised of commissioning the mechanical and electrical systems for the proposed construction of approximately 5,000 square feet of data center white space and support areas. Commissioning services were provided during the design, construction, and warranty phases.
Learn More
Grace fellowship addition (halfmoon  ny)

Grace Fellowship Church – Facility Expansion

Halfmoon, NY
Fusion Systems Engineering provided complete MEPF design services for a 7,600-square-foot addition to the existing Grace Fellowship Church. The expansion was planned to support the needs of a growing congregation, including new classrooms, worship spaces, offices, and multi-purpose activity areas. Our team supported the project from initial programming and design through construction documentation and administration, ensuring seamless integration with the existing facility and systems.
Learn More
Io tier iii data center integrated system commissioning (confidential location)

Tier III Modular Data Center Commissioning – Confidential Location

Delivered full MEPF commissioning services for a 1MW Tier III modular data center, designed for future scalability up to 6MW, on behalf of a Fortune 500 financial institution. Fusion Systems Engineering performed comprehensive testing and thermal scanning of all 13.2 kV and low-voltage power distribution systems, including standby generators, UPS units, fuel delivery, UREA systems, compressors, and switchgear. Mechanical systems underwent extensive operational verification to validate both PUE and CFD modeling assumptions. Following individual component tests, a full integrated failure scenario was executed under design load conditions. Upon project completion, we provided owner training on the redundant chiller plant, PLC logic, and system gateways tied to the facility’s energy management platform.
Learn More
Skidmore jonsson health

Skidmore College – Jonsson Health Services Renovation

Saratoga Springs, NY
Fusion Systems Engineering provided full MEP/F design services for the first-floor renovation of Jonsson Tower at Skidmore College, encompassing approximately 8,000 square feet. The scope included HVAC, electrical, plumbing, and fire protection systems, all tailored to integrate with the building’s existing infrastructure. The HVAC design leveraged the ground-level dedicated outdoor air system for ventilation, the central hot water boiler for perimeter heat, and a new VRF system to deliver efficient comfort cooling. Services were delivered through all phases — from design development and construction documents to bidding support and construction administration.
Learn More
Private luxury collection – 323 east 52nd street new york  ny (new york  ny)

Private Luxury Residence – 323 E 52nd Street

New York, NY
Fusion Systems Engineering delivered full MEP/F design services for the renovation of an 8,000-square-foot luxury residential building in Manhattan, configured into four premium units. The project required new utility infrastructure, including natural gas, electrical, and fire suppression systems. Due to the addition of an elevator, a compliant fire alarm system was also designed and integrated. Our scope included HVAC, plumbing, electrical, and fire protection engineering throughout all phases of the renovation to ensure safety, comfort, and long-term functionality in a high-end urban setting.
Learn More

Design Portfolio

A showcase of our mechanical, electrical, and plumbing design projects. 

Download "Design Services 2025"

Commissioning Portfolio

A showcase of our MEP commissioning work.

Download "Commissioning Services 2025"

Ready for Precision Machining in Albany, NY?

Let Fusion Systems Engineering DPC be your trusted partner for CNC machining excellence. Contact us today for a custom quote and let’s get started on your next project.
Request a Quote